Sakura Internet Ishikari Data Center

ExpandingE3Official company or government statement

さくらインターネット 石狩データセンター

LocationHokkaido Ishikari(Municipality centroid)
StatusExpanding(as of 2025-06-25)
OperatorsSAKURA internet Inc.(Operator)
Power usage effectiveness (PUE)1.24(Measured / actual)(2012)Above 1.2 benchmark
PUE ≤ 1.2 is the legal benchmark under Japan’s energy-efficiency rules for new data centers that begin operation from July 2026 onward (lower is more efficient). Older facilities are out of scope; the line is shown for comparison only.
Nearby power infrastructure
Total generating capacity within 30 km: ~50 MW (1 plants)
Nearest large plant: 苫東厚真火力発電所 (火力) 600 MW / ~73.8 km
Source: National Land Numerical Information — Power plants (MLIT, P03-13(2013年度版)), processed. Sums within a radius tend to be larger in dense urban areas; also consider proximity to a single large plant.
Water resources & flood exposureOpen the water utility and flood layers

Timeline

Important status transitions are shown in English from structured fields. Free-text titles remain in the original Japanese.

  • 2025-06-11 · Expansion
    Expansion: Expanding

    Original (Japanese): 直接液体冷却のコンテナ型データセンター稼働開始

    Original (Japanese): 石狩データセンター敷地内にコンテナ型データセンターを新設し稼働開始。追加投資も発表。

    Expanding
Loading map…

This pin is the municipality representative point, not the exact facility location

Sources (3)

This page does not determine illegality or impropriety. If you find an error, request a correction.