Matsue Nakao District Industrial Park (Data Center Attraction)

AnnouncedE3Official company or government statement

松江市 中尾地区企業団地(Green×Digital Town Project・データセンター誘致)

LocationShimane Matsue(Municipality centroid)
StatusAnnounced(as of 2026-02)
Nearby power infrastructure
Total generating capacity within 30 km: ~265.3 MW (3 plants)
Nearest large plant: 玉島火力発電所 (火力) 500 MW / ~120.8 km
Source: National Land Numerical Information — Power plants (MLIT, P03-13(2013年度版)), processed. Sums within a radius tend to be larger in dense urban areas; also consider proximity to a single large plant.
Water resources & flood exposureOpen the water utility and flood layers

Related planning & procedure

View all records

A summary of public records, not a legal determination or a finding of illegality or impropriety.

  • 松江市中尾地区企業団地におけるデータセンター誘致方針
    Current stage: Announced · Outcome: Ongoing · Last verified: 2026-08-05
    Start: 2026-02 · Sources: 2

Timeline

Important status transitions are shown in English from structured fields. Free-text titles remain in the original Japanese.

  • 2026-02 · Announcement
    Announcement: Unknown → Announced

    Original (Japanese): 中尾地区企業団地の整備・データセンター誘致方針を発表

    Original (Japanese): 島根原子力発電所の電力活用を掲げ、Green×Digital Town Project(GDTP)推進協議会が中尾地区(約11ha)に企業団地を整備。2027年度分譲開始・2031年度稼働目標。データセンター運営事業者は未定(市が整備主体)。

    Announced
    Sources: 松江市
  • 2026-02 · Announcement
    Announcement: Unknown → Announced

    Original (Japanese): 中尾地区企業団地の整備・データセンター誘致方針を発表

    Original (Japanese): 島根原子力発電所の電力活用を掲げ、Green×Digital Town Project(GDTP)推進協議会が中尾地区(約11ha)に企業団地を整備。2027年度分譲開始・2031年度稼働目標。データセンター運営事業者は未定(市が整備主体)。

    Announced
    Sources: 松江市
Loading map…

This pin is the municipality representative point, not the exact facility location

Sources (1)

This page does not determine illegality or impropriety. If you find an error, request a correction.