Equinix TY12x Data Center

OperationalE3Official company or government statement

エクイニクス TY12x データセンター

LocationChiba Inzai 泉野2丁目(Municipality centroid)
StatusOperational(as of 2021-03)
Power capacity54 MW(IT load)
Original (Japanese): 最終フェーズでIT電力供給54MW・約6,500ラック。2021年3月開設時は960ラックから開始
Nearby power infrastructure
Total generating capacity within 30 km: ~3,929.8 MW (5 plants)
Nearest large plant: 千葉火力発電所 (火力) 1440 MW / ~30 km
Source: National Land Numerical Information — Power plants (MLIT, P03-13(2013年度版)), processed. Sums within a radius tend to be larger in dense urban areas; also consider proximity to a single large plant.
Water resources & flood exposureOpen the water utility and flood layers

Timeline

Important status transitions are shown in English from structured fields. Free-text titles remain in the original Japanese.

  • 2021-03 · Operation
    Operation: Unknown → Operational

    Original (Japanese): TY12x データセンター開設

    Original (Japanese): 960ラックから開始し最終的に約6,500ラック・54MWへ拡張予定のxScaleデータセンター。

    Operational
Loading map…

This pin is the municipality representative point, not the exact facility location

Sources (2)

This page does not determine illegality or impropriety. If you find an error, request a correction.